Water main and fire hydrant installation occurred earlier this week on Linden Lane between Central Road and Cedar Street. The proposed water main was also connected to the existing main on the north side of Central Road at Linden Lane. The detour for Weber Drive will be starting the week of September 3rd to complete water main installation between Central Road and Oak Lane. The proposed water main on Weber Drive will be connected to the existing water main on Central Road which will require shutdown. Residents affected by the shutdown will receive a notice the day prior to this work occurring.

See the map below (downloadable) for details on the new traffic pattern.
0 Comments



Leave a Reply.

    Project Updates

    Check here for updates on the water main project.

    Categories​

    All
    Notice
    Schedule
    Weekly Updates

    RSS Feed

Proudly powered by Weebly
  • HOME
  • ABOUT
    • LOCATION
    • FAQ
  • PROJECT UPDATES
  • CONTACT